These applications are the same as for Tanker Unloading and Trigger Filling excepting that:
EPA require that a 9000 litre (One Fuel Tanker Compartment) spill retention capacity remains available upstream of the hydrocarbon spill isolation valve and downstream of the perimeter wall of the bunded platform
Tank and Bund sizing becomes a critical design factor in these applications
These projects require input and design assistance available from our engineering department