Typical Binwash installations require wash down of bins and the paved surface to run to sewer, once washing is finished rainfall arriving on the clean paved catchment is directed to stormwater
Typical catchment area is less than 20 square metres
Wash-down and Rainwater discharge flow rates @ less than 10.0 L/Sec
BW400/100/100 – Refer Drawing – 400mm Square Pit with Class “B” Grated Cover, perforated silt basket and 100mm Trade Waste and 100mm Stormwater outlets